Topic: ↑ „Größtes Projekt Seit dem Limes“
↑ Jürgen Eisenbrand: Sediments from Altmühlsee end up in synthetic basins. These sediments have been removed since September 2015, each autumn and winter. This web page was final edited on September 1, 2021 at 11:Forty am. This web page was final edited on August 30, 2022 at 10:37 am. This web page was final edited on March 25, 2023 at 4:Forty six a.m. This page was last edited on August 3, 2023 at 10:55 am. This web page was last edited on June 26, 2023 at 2:17 am. After it was dismantled on account of dilapidation, it is now related to the path by a connecting causeway. The prices of constructing the system, the detailed planning of which started in 1971 by the Nuremberg Dam Building Authority, which existed until 2000, amounted to approx. The Großer Brombachsee, dammed by the principle dam, serves as a reservoir and the water stage can fluctuate by up to seven meters during regular operation as a result of irregular inflow and outflow. The Birkenhof north of Absberg between the 2 our bodies of water Igelsbach and Gänsbach, whose corridor additionally sank into the Großer Brombachsee, only existed as a barn by 1962. By 1962, just one barn was left standing at the Birkenhof north of Absberg between the two bodies of water, Igelsbach and Gänsbach, whose land additionally sank into the Großer Brombachsee.